Skip to content
← All case studies
Tailwind™ · Netherlands · Retail

Speeding an Air Cargo Hub Without Stopping It

−41%Handling Cost per Order

2.4×Turnaround Speed

Heavy cargo aircraft in flight carrying urgent freight Tailwind™

CHALLENGE

28,000 SKUs flying weekly, ULD builds running wild, overtime every Friday. The hub couldn't stop for a rebuild — peak season was already on the radar.

SOLUTION

A new ULD build plan installed over six night shifts, pre-screened staging beside the build stations and a team bonus tied to kilos per hour. Day operations never stopped; the hub woke up faster each morning.

TIMELINE

  • Nights 1–2: build-plan redesign; staging zones marked and stocked.
  • Nights 3–4: new ULD patterns live; pre-screening moved upstream.
  • Nights 5–6: crew training; kilos-per-hour bonus goes live.
  • Result: 41% lower handling cost, 2.4× turnaround, zero downtime.
“Clear reporting, honest pricing and flights that depart on time. Our production line finally breathes again.”
TOMASZ KRAWCZYK, COO, TAILWIND™
Freighter airplane standing on the runway before loading

Keep reading case studies